SAMBA, May 5: About 30 metres of Service Road along Jammu -Patnankot National Highway in front of Chechi Mata Temple, Samba got eroded in Basantar river along with protection wall this evening.
However, no loss of any kind was reported as during the time of mishap no vehicle was plying on the road.
Soon after the erosion of service road the officials of police and National Highway Authority of India rushed to the spot to take the stock of the situation.
Soon after the incident the Traffic Police diverted the vehicular traffic from other side and service road has been totally closed.
|