JAMMU, Jan 10:In order to carry out LT/HT cabling, PCC pole erection and fixing of LTDB-HVDS by M/S. IRCON International Ltd under R-APDRP project, the power supply to Gujjar Nagar, Christian Colony, Prem Nagar and Lower Gummat areas shall remain affected on January 10, 11, 12, 14 and 15, 2016 from 9 am to 5 pm.
The shutdown will be subject to fair weather condition
|